Evaluation

 

Beginning

 

Developing

 

Accomplished

 

Exemplary

 

Score

 

Scale Drawing

Many features of the room are NOT drawn to scale and/or there is no scale marker on the drawing.
.(0-19 pts.) 
Many features of the room are NOT drawn to scale even though a scale is clearly indicated on the drawing.
(20-34 pts.).
Most features on room are drawn to scale and the scale used is clearly indicated on the drawing.
(35-39 pts.).
All features of room are drawn to scale and the scale used is clearly indicated on the drawing.
(40 pts.).

 

Neatness

Many lines, corrections of errors, and/or features are not neatly done.
((0-7 pts.)
Some straight lines are ruler-drawn, some errors have been neatly corrected and some features are colored completely.
(8-14 pts.)
Most straight lines are ruler-drawn, most errors have been neatly corrected and most features are colored completely.  (15-19 pts.)

All straight lines are ruler-drawn, all errors have been neatly corrected and all features are colored completely.(20 pts.)


 

Price List in Excel

Many items are not on spreadsheet and costs/taxes of all items are not included.

(0-7 pts.)

Most room items are included on a list (not Excel) with minor errors in cost/taxes. 
(8-14 pts.)

Most room items are included on Excel spreadsheet with most costs/taxes.

 (15-19 pts.)

All room items are included on Excel spreadsheet with cost./taxes
(20 pts.) 
.

 

Total Cost

Total cost is not included and/or is over $2,500 by more then $100.

(0-4 pts.)

Total cost is not included or is over $2,500 by $51-$100.

(5-7 pts.)

Total cost is not included or is over $2,500 by less then $50.

(8-9 pts.)

Total cost is included and under $2,500.

(10 pts.)


 

Quiz Completion (2)

Quizes are not turned in with project.(0-2 pts.)

Quizes are not completed and/or turned in late.

(3-7 pts.)

Quizes are mostly complete and turned in with project.

(8-9 pts.)

All quizzes are completed, printed, and turned in with project.

(10 pts.)